Home

The TAWARA_RTM project aims at developing a complete platform to control the quality of the tap water with respect to the radioactivity content. The platform will provide a real time measurement of the activity in the water (measuring the gross alpha and beta activity) to verify whether the distributed water is far from the limits set by the EU legislation reaching thresholds that require rapid actions.
In case of an alarm due to an activity in the water lager than the defined thresholds, a warning message is sent to the water plant management to verify the need of stopping the water distribution.
At the same time, a second part of the system is activated, to determine the nature of the contamination by gamma ray spectroscopy, defining the nature of the contamination and the corresponding counter-measures. Moreover, the determination of the contaminants is needed to establish the effects on the population and produce a full information report to the Civil Security Authorities.
The prototypes of a real time monitoring system and spectroscopy analyzer will be designed, built, tested under laboratory condition and finally installed at the water plant in the North Waterworks Plant of Warsaw managed by the Warsaw Waterwork Company (Miejskie Przedsiębiorstwo Wodociągów i Kanalizacji w m.st. Warszawie S.A. – MPWIK), for the demonstration campaign.

 

Latest News

Page 1 of 2  > >>

Mar 7, 2014
Category: News
The polish partners MPWik and NCBJ organized a meeting in Warsaw on 5-6 March, 2014 to discuss and organize the tasks of the incoming work packages WP2 (real-time monitor) and WP3(spectroscopy detector). During the meeting the partners had the opportunity to visit the place where the final prototype will work for the demosntration phase at MPWik, and also the NCBJ laboratory. 
Dec 20, 2013
Category: Press
The “TAp WAter Radioactivity Real Time Monitor (TAWARA_RTM)” Project aims at developing a complete platform to control the quality of the tap water with respect to the radioactivity content. 
Dec 13, 2013
Category: News
All partners involved in the work-package WP1 about the definition of the system requirements met on 12 December, 2013 at the University of Padua for coordinating the efforts to accomplished the tasks of the WP1.    

Users' Login

 

 

Forgot Your Password?  Forgot Your Login Details?